All Avalon Equipment is currently running a 150-180 day backlog. This delay is at the manufacturer and is the result of labor and supply shortages and affects all resellers world-wide.
Avalon ADF26-G Gas Fryer / Standing Pilot (18" x 26") RIght Side Drain Board With Submerge Screen